 
Criteria
| Category: | Modell, Konstruktion, Material, Technik | 
| Cost: | mittel | 
| Subject: | NAWI, Musisch-kreativ | 
| Age: | 14 – 19 | 
| Group: | kleiner 15 | 
| Duration: | mehrtägig | 
| Procedure: | ExpertIn erforderlich | 
Abstract
Using spaghetti and glue, build a bridge with the greatest possible span that can carry one kilogram of weight.
Discover structural behavior without using formulas or calculations.
Objective
– get acquainted with the profession of engineering
– introduction to the fundamentals of statics
– learn about the properties of construction materials
– experiment with loading tests to measure structural capacity
This project was developed by: Renate Rinke (Lehrerin), Reichart Marius (Diplomingenieur) and made possible by: ats Architektur, Technik und Schule, Salzburg.
When you have done this project, please send us your feedback.








 bink auf facebook
 bink auf facebook